VADİ KULE KARTAL


Project delivery date: the apartments are scheduled to be delivered in January 2015.

The rising value of the new Eagle Vadikule. Both the living and business, as well as the new address for the holiday. Visual richness, opportunities and add value to your life with the location of Vadikule to comfort Eagle quality safety will present quality of life. Courthouse, 5 minutes, 3 minutes, the coastal road in the van to the airport, 15 minutes, 2 minutes, Sabiha Gokcen, Kartal training and research hospital, 5 minutes, 2 minutes to the Marmaray project • 4.223.consumer finance m² land totaling over 18,500 m² construction • 3.500 m² green area • 22 normal floors + ground floor + 2 a total of 98 apartments and 3 basement store • the project (3 + 1) 34 apartments, (2 + 1) 44 apartments and (1 + 1) are available in the shops on the ground floor of 20 apartment 1 • the basement social facilities and indoor parking, 2. TECHNICAL SPECIFICATION for underground parking basement...

DESCRIPTION and SCOPE of Regulation in the form of land share for construction (building) made and promise of sale agreement is an integral attachment of these utilities specification, to be constructed by the contractor, on the real estate in question, in buildings, in the garden, the environment will be used in the regulation of materials, applications, must be followed in detail all technical aesthetic issues and specifies the relevant standards. The constructions will be held with the newest technology and modern luxury class. The contractor will implement their own independent sections of further enhancing the quality of the innovations, material and other improvements, the owner of independent parts of the plot also applies in full. Domestic products TSE, imported ones is its own country norms. These utilities are not specified in the specification matters Ministry of public works Building works Public Specifications. T.c. Ministry of energy and natural resources conditions of Internal Wiring Regulations and Electrical Utilities. Plumbing, Heating, natural gas Utilities Plumbing Specifications with other applicable based on the current specifications in their own fields.

DESIGN PRINCIPLES by considering the target audience, 3 different sized apartments planning amaçlanacaktır. The peaceful and healthy within a secured site, target audience, who wants to, good income consists of cultured people. Constructions reinforced concrete frames, the exterior of the insulation is silicone paint, glass, granite, aluminium composite panel, ceramic etc. coatings are available. Social facilities, recreation, sports and entertainment area and the planning of commercial areas to meet your own site shows care.

Social facilities are closed ones: swimming pool, sauna, squash, table tennis, gymnastics.

Open the ones: Swimming pool, children's play area, parking, porch is six. In other places, cafe and bar.

Following the surrender of the construction CONTRACTOR'S RESPONSIBILITY for defects in the buildings soundness specified, kaliıe will affect the size of the installation is by playing the contractor the price on demand Within 1 month without being resolved. Combi, video intercom, etc. in relation with the manufacturer warranty, complete land shall deliver to the owner.

PROJECTS site plans, architectural, structural, mechanical, electrical and thermal insulation and channel projects will be prepared in accordance with all applicable regulations are necessary for the application parts (doors, Windows, stairs, kitchen, bathroom, wc. facade etc.) will be detaylandırı.

The remaining parts of the building's INSULATION WORKS land under the level of seated areas, side surfaces with 2 layers of polyester external bundling pipes insulated against water with bituminous membrane. This part should contribute to the impermeability of the concrete. Insulation over 3 inches thick coated with XPS sheets. This application is also applied in laying of balconies and terraces. Lofts sealing water-heat-steam cutter consists of layers. Used wet sites, six in the same way that heat the tiles with a space and insulated against water and the floor is made of sound insulation. The exterior walls of buildings of six floors, such as surfaces and must pass to each other non-building density, 30, 50 mm XPS plates are isolated.

ROUGH CONSTRUCTION molds 8OOO-12000 RPM impact resistant, reinforced concrete vibrator minutes, water will leak into the Groove. Installation locations of the holes, vents, chimney, water, heating, electricity and so on, these parts by marking in the project for reinforced concrete and the edges of non-ferrous and reinforcement. Construction tunnel or ready form system is used. Construction according to TS 11222 (C40 class ferrous concrete is used. Outdoor temperature + 3 degrees Celsius and below the socket Accelerator additive heton is used. Fill concrete are 250 dozludur. Reinforced concrete iron rebar, Rebar, pull, St111 is quality. St IV B-quality wicker and iron can be used in upholstery. Irons placed into molds plastic pas share chocks are used. Following the excavation work, retaining walls, drains, channels, installation are made. There will be parts of earth fill vibratory hammer or kompaktörle can be compressed to 15 cm block was made by 250 DOSER grobeton is poured. Garden arrangement, non-stabilized (against collapse) to ground floor concrete or other pavement operations are made. Ground waters to collect the rain water around buildings building, underground parking, rain drainage system environment and will be set to the input channel is connected. Indoor garage entrances and similar can collect rainwater to cast grate the remaining parts of the low pitched and rainwater harvesting are channels also. Also, Garden irrigation and sanitation in artesian opens. Exteriors interlaced granulated şistli Kris-Delta or equivalent brand 19 cm insulation bricks kullanılırak perlite with mortar grout. The partition walls, plumbing pipe passes through the building at 19 cm, exceeding the 8.5-inch perforated bricks with grout. Placing the roof with steel bearings, heat insulation for roofs is coated with copper or if the tile. Bacalar is plastered with a fabric with the appropriate hats, chimney and roof hatches are closed with copper.

Waste water, RAIN WATER INSTALLATIONS, streams and GUTTERS Plumbing Design or equivalent brand 3.2 mm thick, made of polypropylene material pipes and fittings are used. Suspended ceiling installation pipes are passed through a lower floor. The low floor is done. Installation channels (shafts) is passed. Rain downspouts 100-I25mm-wide copper. The basement of the building, parking garage, the other on the ground floor in sections, should prevent the smell in stores titled in the lively and interests, the terrace leaf strainer siphons are used. The lower end of the maintenance and cleaning of the pipe the landing flaps are found. Vertical-horizontal colon links and made some columns, clear from the elbow axis. It pierced the top is stretched out of the building to the ends of the air admittance valve is attached. Kitchens all wet areas (balcony, bathroom, toilet, terrace, basement, etc.) floor drain sink, bathtub, shower and tub outlets ECA ARTEMA or equivalent brand siphons are used. Toilet bowls with wall hangings, stores recessed type. The kitchens include dishwasher and kitchen sink goes to are dropped. Creeks, downspouts, clamps 12 No. Bakırdandır. Hidden streams of the Interior is covered with special insulation material after it has been isolated. Cleaning and maintenance intervals horizontally left the manhole. Pipe connections flexible spiral double-storied.

COLD WATER Flats, shops, Gatehouse, Garden irrigation so that it can be detached for ceselsan plumbing contract İski Pipes and fittings, polypropylene (pp) material is selected. Valve, check valve, such as yellow and bronze ones of ECA-or equivalent from is selected. The counters are in the basement of the apartment shall be installed after the booster output, and the recoil against the plate, ECA or equivalent non return valve is attached. Installation chimney pipes passed through the walls, tiles, and from isolated. Reservoirs built, klo