PROJECT DELIVERY DATE: the project is scheduled to be delivered in December 2014.
Continuing to rise Istanbul star Çekmeköy, Üsküdar-Cekmekoy metro route, 3. Bridge on the port, Universities and hospitals in the vicinity of the silhouette of the forests Taşdelen, clean air, beautiful nature, insatiable need for a new life, as well as new and profitable investment for the project CONCEPT ÇEKMEKÖY, esteemed proud to see our friends.
FEATURES HIGH QUALITY • central heating system • Heat share meter • Earthquake • certified ISO certified Insulation Energy Yönetmenliğine the appropriate Identity Certificate • • high level technological infrastructure • Teka brand 3′ built-in set • Winsa brand dorado series Joinery SOCIAL CONCEPT • semi-Olympic swimming pool • children's Pool • indoor swimming pool • Sauna • Fitness • Basketball and volleyball court • Mini football pitch • children's play area, the CONCEPT of SERVICE • 7/24 professional security • Camera tracking system • dual Elevator • Covered car parks • central door intercommunication System • Management Office • Site Assistants
Which ONE is APPROPRIATE for YOU according to your needs with 140 m2 to 60 m2 between different 1 + 1, 2 + 1 and 3 + 1 apartments awaits you ...
SITE PLAN in 3 stages, 14,000 m2 of land, 6 blocks and the concept of the store Çekmeköy, walking and bike paths, indoor and outdoor swimming pools, sauna, 24-hour video surveillance system, social facilities, children's play areas, mini football, basketball courts, indoor and outdoor parking you will have new and peaceful way of life.
TECHNICAL SPECIFICATIONS a. GENERAL a) Construction, Ministry of technical specifications and related projects will be eligible to certify as Mayor, will be made as concrete carcass.
b) to use the materials is specified in this technical specification, the relevant standards shall be used in quality.
c) all work in this building luxury class materials and luxury class workmanship will be made.
B. Basic and CONCRETE a) There about the architectural project was the room Visa site investigation, reinforced concrete projects 9. Quakes at earthquake-proof will be prepared as well.
b) production credits to use concrete C 30 class concrete will be.
c) Static equipment ST III certified iron rebar (reinforcing) will be, will be taken from the TSE.
d) Basement slab of girder plate concrete floor tiles flooring, floor decks will be beamed as the ribs.
e) will be made, based on ground investigation are possible from the threat of water adjusted for raft Foundation held and as waterproofing bitumen based insulating membrane or capillary material with 2 floors will be made.
f) ground water based on the lower level of the drainage system established (with a perforated pipe and drainage manholes, geotextiles) will be removed from the building g) each floor concrete samples taken tested an equivalent institution of highways or reports will be archived.
Downloaded onto the steel sample test materials out of the construction site of deprivation by subtracting, it certainly will not be used in construction.
C. external and internal WALLS are heat and sound insulation of outer walls in accordance with the project of 15 gas concrete blocks with örülecektir and 32 kg/m3 styrofoam roofscape. The outer surface of the mineral plaster roofscape. Interior walls will be made of gas concrete, 8 apartments with common walls, concrete of 15 örülecektir.
D seat the roof will be made in accordance to its projects, the roof. Water and heat insulation on the roof will be made, in the case of the implementation will be done in putting roof shingles. The UPS will be made with PVC pipe Creek.
E. ENVIRONMENTAL DRAINAGE – RAIN WATER – will be the building's gutters hidden Creek NEFESLENDİRME, leaks and moisture will be isolated in the best way, first class workmanship will be made carefully. Downspouts PVC pipe in such a way as to disrupt the aesthetics of the garden and will be downloaded and will be removed from the building. This water will be coming in the balcony. Installation nefeslendirme are removed from the ends of the roof will be wearing a hat. Drenflex pipe in the basement and around the building with drainage made the surface waters from the basement and the base will be zoomed out of.
F. SÜPERGELİK STAIRS RAILING a) floors, entrances staircases and steps will be marble, Granit.
b) stairs, railings, aluminum will be.
c) stair and landing walls PK satin paint will be.
G. EXTERIOR JOINERY WORKS a) Windows and balcony doors colour (the colour of Aamer Pimapen, Winsa, cricket will be the brand or.) will be held according to the shape of the Kathmandu project heat.
b) double window sizes 4 + 16 + 4 will be in the form of.
c) Sills window sills will be dropping a 3 cm. thick.
H. the APARTMENTS ENTRANCE door will be Steel + wood veneer. Door peephole, double lock and safety chain to be found.
I. HALL – ROOM a) will be covered with laminate flooring and Chambers Meetings.
b) Ceilings will be painted with plastic bottles pet.
c) Ceiling Wall combinations, will be made of gypsum drywall. In front of the window curtain curtain slot will be void.
d) but the glass on top of the drywall will be held as a curtain.
e) fences with protective air dehumidifier desteklendikten after 3 coats of PuTTY is met will be painted with a modifiable satin paint.
f) Doors will be door furniture.
J. ENTRÉE – HALL a) floor and Baseboard 1. quality ceramic brand Vitra or Çanakkale, 1. class workmanship residue.
b) Walls will be painted with 3 coats of satin paint onto the PuTTY.
c) Ceiling Wall combinations, will be made of gypsum drywall.
K KITCHEN – bath – WC – BALCONY BATHROOM • Bathroom Vitra brand toilet bowl and sink will be.
• Shower tray is ShowDuş brand will be.
• Laundry faucet and bidet taps between Eca, muscle or Artema will brand.
• Bath and washbasin are Artema or equivalent would be the brand.
• Bathroom Cabinets of mdf chipboard body covers, coating or glossy lacquer will be. As granite or glass countertop material will be used and undercut hilton sinks will be mounted.
• Bathroom and WC ' s Vitra or equivalent will be furnished with a ceramic products.
KITCHEN • kitchen cabinets double colors and patterns will be identified with the projected option.
• Kitchen countertops, laminate or granite countertop will be.
• Bench will be placed upon the Teka sink brand or equivalent.
• Kitchen sink faucet Artema or equivalent would be the brand.
• Kitchen counter between Vitra or equivalent brand tiles brand roofscape.
• Kitchen will be furnished with a ceramic products for Vitra or equivalent location.
BALCONY • balcony, the interior walls will be mineral plaster.
• Balcony in the kitchen and the Hall would be the same ceramic.
• With their skirtings 7 cm. wide will be ceramic.
• Sills, 3 cm. thick dropper Marmara marble, the floor drain 1. quality will be plastic.
• Get in measures of water Also will be taken to the balcony.
L. LIFT Lift starting from the basement, each floor staircase landing of the port shall be at least 2 pieces of TSE certified four-person 1. quality will be. In accordance with the technical norms 1. class will be held in the Assembly and installation of workmanship the company will commit to undertake maintenance and repair, too. Elevator ES or equivalent would be the brand.
M. COLD-HOT WATER INSTALLATION a) Project in accordance with TSE plastic pipe and fittings shall be made of pprc.
b) will be placed in the apartment's main entrance counter from each apartment also will be put on the water meter.
all of the garden or in the basement of the apartment building project in c) in accordance with the in-store enough water to be made in epoxy coated.
d) City running water or in the repository will be given water as pressure hose for hidroforla.
e) Building and apartment distribution system will be the white pipe Vesbo TSE Euphrates or brand.
f) Valves, batteries, and fixtures (ECA or Artema brands) 1.-quality will be.
g) pressure tank warranty leaflet, user manual and technical documents and equipment will be delivered to the owner of the goods.
N. WASTE WATER
No comments:
Post a Comment