
Our Lotus built in beylikdüzü Life Smart Houses with advanced state-of-the-art, contemporary and safe life, we're opening the doors.
2000 m 2 area on the 9th floor, the construction of the planned project, 2009 36 apartments in March, starting in June 2010, a cosmopolitan city like İstanbul are completed. the live traffic and safety concerns persist; Beylikdüzü region a delicate Lotus Flower rising as our building; luxurious, comfortable on top of standards, offer a privileged and secure life.
Apartment Types In The Project;
» 9 x 84 m 2 1 + 1» 24 x 160 m 2, completed wohnhaus/w.fl.161m2/, 185m2 3 + 1» 2 units 298m2 and 305m2 5 + 2 roof duplex» 1 piece 365m2 6 + 2 roof duplex as is scheduled.
» On the ground floor there are 5 shops as of the position of the Lotus Life E-5 highway, hunters sea close to Ataturk Airport, buses and transportation of your life easier. Located in the area near Bauhaus, Carrefour, Migros, such as shopping centers, Beylicium, Mediamarket Markacity throw in the stress of the day, you don't have to go far to meet your needs do not. For health services at Acıbadem Beylikdüzü Medical Center, Esenyurt, İstanbul Medicana International Hospital, the State hospital can be reached in a 10-minute walk away. Tüyap fair Convention and Congress Center and Sir College, Fatih College, Gabriela College, kits College teaching institution, David Andrade, Andrade, Prudencial, İstanbul University, Beykent University, Fatih University, Kadir Has University close in terms of education and culture provides a great advantage to you, too.
1) structure General» the latest earthquake regulations raft Foundation and reinforced concrete frames olarakyapılmıştır.
» As a material; Steel class CC III (ST420) accessory, C30 concrete were used.
» Flooring, 35 cm floor tiles were made as» bulkheads at the top level was built with Ytong materials that provide sound and heat insulation.
» Building in and around 2 times on the basis of PP300 felted and provided waterproofing membrane with ardoise-.
All the materials used is TSE norms».
2) EXTERIOR and ROOF» external walls of Ytong wall over 5 cm Maister-Austrotherm (16-18 kg/m3) EPS, Maister plaster mortar and Vertex reinforcement NET onto the cement-based si likosi likatlı is made of decorative coating coating by applying paint on.
» Decorative columns, wood-like Naturalbond is coated with composite, as an insulation material in 5 cm rock wool has been applied.
» Steel construction roof over 1.2 cm plywood, 3 cm thermal insulation material, 1.5 cm OSB 2 coats of waterproofing material, Bilal and applied membrane ardoise-PP300.
» Steel construction under 4 cm polyurethane foam heat insulation has been strengthened.
3) Interior-EXTERIOR JOINERY» SCHÜCO CORONA CT 70 exterior, interior-exterior cream coating joinery has been used, tilt & turn Windows and tilt & G/U Wolksvagen sliding balcony doors were used.
» 4 + 16 + 4 green heat is going.
» Apartment exterior doors, wood-paneled TSE guaranteed Tutkunlar end.URN.San.TIC.Ltd.STI brand; Wing thickness 8 cm. Wings-double DKP a-1 quality hair used. Search for fill material is stone wool. Fingerprint reading system available.
» Interior doors hardwood over the lake, and the wing thickness 40 mm.
4) flooring, interior wall and ceiling COVERINGS and entrance CLOSET» entrance hall and corridors» floorings: 1. class Vitra brand ceramics have been used.
» Walls: Hallways covered with imported wallpaper.
» Ceilings: the halls there are crystal glass spots were used.
» Cabinets: glossy lacquered doors, Blum hinges, telescopic drawer slides were used.
» Lounge and Bedrooms» floorings: Salon Serifoglu brand laminated parquet, rooms are furnished in the brand Tarkett laminated flooring.
» Walls: living room, the only room walls are coated with imported wallpaper walls are satin plaster over silicone silky Matt painted with.
» Ceilings: water-based silicone antibacterial paint halls and rooms using plasterboard is applied.
» Cuisines» Tiles: kitchen floor 1. class Vitra brand has been used from glass mosaic kitchen counter, ceramic coated.
» Walls: all walls are coated with imported wallpaper walls are satin plaster over silicone silky Matt painted with.
» Ceilings: water-based silicone antibacterial paint is useful.
» Cabinets: Kitchen cabinets, 18 mm Chipboard body, shiny PVC caps, Blum Tandembox with drawer Rails, Blum hinges, ½ tube turns the corner with the basket were used.
» Bench: Antibacterial and heat-resistant corian worktop will be used.
» Amature: Artema brand fittings are used.
» White goods: all apartments Siemens built-in hob, oven, extractor hood, microwave and dishwasher is mounted.
» Sinks: 1.5-eyed controlled Teka brand.
» Baths» floorings: General bathroom, ensuite, WC in floor 1. class Vitra brand ceramics have been used.
» Walls: 1. class Vitra brand ceramics have been used.
» Ceilings: ceilings of the Common bathroom, ensuite, WC spot light were used.
» Luminaires: Artema brand fittings are used.
» Vitrified: Vitra brand Jacuzzi bathtubs, shower trays, concealed cistern + toilet and sink were used.
» Cabinets: lacquer bathroom Cabinet, and will be used with modern design Corian sinks • Jacuzzi, shower • bathroom and WC in the timer Airlüks brand has been used mechanical ventilation» Cellar 1 + 1 has a washing machine infrastructure plans, more goods will be stored in the pantry again.
» Common premises in buildings • ground floor building entrance hall and the walls of the ground floor halls of granite, stone and imported wall paper coating.
• Building located at the entrance to the Security-Advisory.
5) SANITARY PLUMBING» heating» apartment heating system is installed in each apartment Buderus gas boiler.
» Radiator Thermoteknik brand.
» Water tanks» tank with Clean water and fire are in store for.
» Air conditioning» lounge and master bedroom split air conditioner is for.
6) electricity – WEAK CURRENT Grounding Installation made of All building grounding installation»».
» Earth leakage Relays» in terms of safety of children thought to have this system in any response made to the plug and the electrical circuit to the Khan.
» Phone» every room room data, telephone and satellite tv output available.
7) SECURITY Lotus Life project, '' intelligent building automation system, '' has placed entries» apartment burglar alarm» motion sensing detector will prevent unauthorized entries to the apartment with the burglar alarm are available.In such a case, the beeper go off, giving you and gives you mobile phone and related institution news» panic button» Home alone in the case of sudden illness, the remaining patients and elderly people from the apartments headboards, shower tray placed on the panic button gives information to family members through the service of giving the news, while 112.
» Fire, gas and water Alarm system» gas, water and fire detectors located at home thanks to the main system automatically in case of any danger by disabling family members with information on mobile phone, while the emergency organizations and State reporting.
» Fingerprint reading system» apartment entrance fingerprint reading system is connected to automation.Can be locked on and off door finger created.Besides that there is nobody at home, purged from the house phone in situations where password by entering the door can be opened.
» 24-hour video surveillance system» founded 8 piece around the building 7/24 record field and will be monitored by security camera system with night vision.
8) DIGITAL SATELLITE and TV SYSTEM PACKAGE PUBLICATION ENGINE CENTER» Digital TV infrastructure suitable for publication, and headquarters of the supply as well as no digital receiver that can be monitored in each room without TV, and satellite broadcast system will be established.
9) color DISPLAY DIGITAL INTERCOM system» for each flat color video doorphone digital intercom system will be established.
10) İNTERNET system» all apartments have internet infrastructure cabling will be made.
11) APARTMENTS BETWEEN INTERVIEW» Site-wide of each flat is provided with each other in order to communicate for free to ...
12) CARD ACCESS system» Site entrance, residents of the apartment block entrance and parking lot entrances with detail are installed digital switching equipment will be provided.
13) GENERATOR» path during power outages, environmental lighting, central systems, common technical infrastructure devices and all apartments to meet energy need of the emergency generator.
14) ELEVATORS» SCHINDLER Brand has been used the elevator, WWWF speed control 1.2 m/sec capacity of quiet machine movement system.
» Elevators need renovation as well İSO, TSEK and CE certified.
» Cabin ventilation forced fan provided.
» Cabin stainless sheets, ceiling led crystal glass, the floor is made of granite in the coating.
15 indoor parking for vehicles in car park»).
16) LANDSCAPE» relaxation» playground» landscape and the arrangements have been made to the project proper germination.
For detailed information call 0212 854 33 99 contact us at.
HABERLER02-the PROJECT 12-2011-Lotus Life 290 thousand pounds Last 8 apartments
No comments:
Post a Comment