Pages

Saturday, February 28, 2015

İSİS PARK

İSİS PARK


PROJECT DELIVERY DATE is scheduled to be delivered at the end of 2014 the project:.

PRIVILEGES İSİSPARK 2 blocks specially designed for a total of 32 apartments and 7 consists of a commercial unit. All apartments in the carefully thought-out architecture, details offers the quality of CONSTRUCTION of İSİS. In the project type 2 + 1, 3 + 1 type, 4 + 2 duplex and duplex houses up to 5 + 2 according to the different needs, there are options.

Comforts of a boutique project * renewable energy System * central heating * intelligent building location for universities, schools, shopping centers, hospitals and Manchester United very close which makes life a lot easier with time savings provided by İSİSPARK.

Your Home; Streetside stores change!

Streetside store consisting of project İSİSPARK; restaurants, cafes and chic shops you will become one of the most respected "city life".

İSİSPARK; just like you like 32 apartment 7 commercial unit low-rise horizontal architecture for each flat parking Otoparkdan floor elevators, with children's play areas.

In the Centre of the elegant landscaping and green human serves quality fields.

Green Valley extends from the project A + quality standards in comfortable living PROJECT DETAILS in accordance with INTRA-SİTE GLOBAL MANUFACTURING project for the digital color video intercom system will be established. The apartments, block the entrance and the entrance gate will be able to communicate with voice and video site.

In all public areas and apartments will provide 50% will be redundant when that energy generator capable system.

IEEE C95.1 (international electrical and electronics standard) in accordance with the provisions of grounding and lightning protection installation will be the facility

According to the project concept and architectural design; the public will support the needs of electrical and scene of the Administration in such a way that deem appropriate energy systems will be in accordance with regulations and specifications also.

The scope of the project urban furniture, relaxation areas and a children's play groups will be found. According to the project site are herbal and structural landscapes will be approved.

Garden, walkway lighting according to the project of lampposts, decorative types and led luminaire will be with also.

BLOCKS-WIDE ACTION MANUFACTURING Buildings reinforced concrete frames and housings with parking lots will be made with conventional systems. Building on the basics of raft Foundation or deep Foundation systems will be built using the.

The façade of the blocks, architectural project in accordance with the siding materials and/or exterior paints will be used.

Exterior walls of brick and/or concrete, internal walls are brick with materials made of aerated concrete wall and/or will be made.

Block the entrance for each flat will be the mailbox.

Architectural floor plan in accordance with the regulations of the places shown in the Fire fire Cabinet, installation of fire sprinkler water intake mouth and will be made.

Central cascade system (mini-boiler and/or wall mounted condensing boiler) heating installation is to be done, will be done with heat expenses sharing calorimeters. Final Accounts; bathroom in the scene except in accordance with the project compact valved PKP and/or PKKP type panel radiators and/or underfloor heating system, bathroom with toiletries chrome towel radiators and/or underfloor heating system will be used.

Fixed camera, digital keypadli, LCD screen, capable of opening the door intercom with a password and when Bell Panel will be recorded for security purposes.

Sortisi decorative lighting fixture in accordance with project/facility will be recorded for security purposes. In accordance to its projects, when with the block name will be FLAT in GENERAL lighting sortisi lighting fixture THERE PRODUCTS door to door wing of the two sides of the Apartment, jamb and casing on MDF wood and/or PVC and/or laminate and/or lacquer paint will be covered and will be assembled together with Accessories.

Apartment interior doors; Mono block full door and/or laminate veneer on MDF and/or and/or lacquer paint and/or PVC coated glass and/or glass inner door wing, deposit box, jamb will be made and will be replaced with metal parts.

Independent of all external frames of PVC joinery and/or aluminum joinery + heat control coated double glazing will be made. Obviously, there will be at least 1 is a double drop-down.

Independent section in the hallway of the wood veneer or lacquered, painted or pvc coated hanger/cloakroom cupboard will be made.

Two common walls separating the apartment living room and/or rooms will be made from parts of thermal and acoustic insulation.

Apartment with bath-wc-pantry, excluding all other militant in drywall or gypsum drywall applications will be done/and the kitchen, foyer and Hallways where deemed necessary in accordance with the project suspended ceiling applications will be done.

Approved in accordance with the project site will be drawn at the natural gas infrastructure installations, blocks, social facilities, commercial units and other natural gas consumption will be held at the facilities of the connections.

Heating Facilities; Project in accordance with the installation and/or compact valve panel radiator heating system in accordance with regulations, whether the scene of minimum 15 ° C the temperature can be set in accordance with the TS EN 215 thermostatic valve and/or the thermostat will be mounted.

Lounge with air conditioning in accordance with the project infrastructure installations (copper pipe and drainage) will be made with the installation of the internal and external unit.

Master bedroom split air conditioning in accordance with the project infrastructure installations (copper pipe and drainage) will be debited.

Electrical and lighting installations; Furnishing an adequate number of suitable alternative architectural and project/TV outlet will be sortisi also. In accordance to its projects, when the chandelier on the ceiling as sorties will apply. Accordance with a sufficient number of children will be protected when the energy outlet grounded sortisi. Accordance with a sufficient number of adequate numbers of telephone and data sockets will be of sorties. TV installation; System 60 RF (20 P/BG channel + 40 QAM (30 SD QAM + 10 HD QAM) digital bouquet, 30 Digital (QPSK) package + FM QPSK-PAL/BG channel, 30 Digital (QPSK) packet broadcast on in a single Center, picking up 47 with 2400 MHz. range of mixed fiber-coaxial (HFC) or alternatively only the coax Ultra Broadband (UBB) will give to the distribution networks. Appropriate receiver can now be followed also encrypted using publications.

The MANUFACTURING HALL/construction WALL plaster + plastic paint and/or wallpaper will be made.

FLOORING Project and in accordance with the details; Heat and sound insulation and/or floor heating mattress + alum + porcelain ceramic and/or granite tile floor covering will be made.

CEILING plaster + plastic ceiling paint and/or false ceiling applications will be done where necessary.

According to the project of the Foyer lighting ELECTRICITY sortisi J1/J3 type fixture will be the resort. The Corridor project appropriately to Alvin ve sincaplar 2 lighting sortisi J1/J3 type fixtures when with video intercom unit will be assembled in the foyer will be colored. In the Hall, according to the project general-purpose children protected grounded outlet will be sortisi also.

SALON/construction WALL plaster + plastic paint and/or imported wallpaper will be made.

FLOORING Project and in accordance with the details; Heat and sound insulation and/or floor heating pad/plate + alum + laminate flooring and/or laminated parquet and/or will be solid parquet CEILING plaster + plastic ceiling paint will be made. SKIRTING BOARD MDF laminate and wood veneer and/or/or lacquer paint and/or PVC coating will be doing the baseboards.

The DOORS are full of doors and/or Mono block on MDF wood veneer and laminate and/or/or lacquer paint and/or PVC coated glass inner door wing, deposit box, jamb will be made and will be replaced with the Assembly Lube AIR CONDITIONING INSTALLATION in accordance to its projects, as the split air infrastructure installations (copper pipe and drainage) will be made with the installation of the internal and external unit.

Kitchen/CONSTRUCTION WALL plaster + plastic paint and/or wallpaper will be made.

FLOORING Project and in accordance with the details; Heat and sound insulation or heating mattress plate + alum + ceramic flooring will be done.

CEILING plaster + plastic ceiling paint will be made.

SKIRTING BOARD MDF laminate and wood veneer and/or/or lacquer paint and/or PVC coating süpürgel

No comments:

Post a Comment