Helis Metro Office, the rise in the new favorite Eagle of the Anatolian side.
The e-5 's five steps away from the metro station on the Metro Office aims to make it easier for end users work, protect it from unnecessary spaces, costs, and just mowing is to focus on.
It should be in an Office conference room, kitchen, separate room for areas such as the Secretariat and the personnel in charge of these units in the project without running these services we are analyzing a single point. The user just stays focus on work. In addition, we design the layout of cinema seminar room with educational organizations, such as the dealer meetings, not in hotels, we project solution firm can place we went.
This will increase the value of the project, such as; investors also will affect positively their investment return rate.
The management of the project, architecture, features, operating system, as before in every stage of the project we have taken advice from White. The Helix Structure as the first project in the region is possible toward which we, our investors have gained value and their demands that caused us to implement the project.
The Helix Structure as we plan to deliver May 2014 Helis Metro Office project, we have continued to contribute to the urban transformation in Eagle.
Always ahead, we will continue to design the living projects.
Details • 19 times, 77 independent section.
• 65-75-85 m2 modular/combined Office.
• up to 90 m2 of meeting/seminar rooms.
• Commercial office deed.
• 4. from the sea floor.
• Each Office, a private balcony and a toilet/kitchen engine.
• Special archive rooms.
• VRF air conditioning system.
• Generator.
• Professional operating system.
• Concierge, call center, Back-Up services.
• Valet service.
• Cafeteria.
• Raised Floor.
The main objective of the project the GENERAL STRUCTURE of Helical Metro Office Turkey on construction and application of construction standards in the world and the function of the safety, comfort, quality, life satisfaction and aesthetically the first is to perform. The building will be built as the material, manufacturing and labour 1. class will be built to standards. All that will be used in the construction of rough and fine in building materials, it is essential to have a minimum TSE quality conformity certificate.
GENERAL FEATURES On-site meeting rooms, Office will work to call center and cafe has a granite or marble-lined business center, places, ceilings, decorative lighting, reception desk and lobby area with reception and tefrişatlı all kinds of infrastructures made up of independent section entries will be incomplete offices.
ROUGH CONSTRUCTION SYSTEM for REINFORCED CONCRETE • building project will be constructed according to concrete carcass. The building's architecture and the way that you design and construction stages of static project technological conditions, current regulations and specifications with the postclassical earthquake conditions. For this purpose, according to the latest technical specifications outside of the conditions specified in the static project organized sailing and technical principles described should be about rigor, be complied with at every stage of our project is the most important policy.
• Static iron cross section will be selected on the project to their observance of the rebar, and cannot be changed without the approval of the project has been awarded. This topic will be based on the overall Ministry of Technical Specifications. Static project was conducted in accordance with the conditions of the 2007 Earthquake. Concrete structure will be used as the mold and mold at the Ministry of General technical specification provisions is essential.
• Will the base raft Foundation.
EXTERIOR façade of the building's Interior and exterior custom as projelendirmiştir. This particular architectural concept incorporating physical and functionality while performing the application will be made. The facades are two indispensable element of life comfort of heat and sound proofing to ensure developing construction technologies of the day and for the purpose of building materials by using the application will be made.
INSULATION of the building's basement are made of bundling. Under-Foundation bituminous and vertical are membrane will be used.
ELECTRICAL INSTALLATION • Building all-electric project and implementation of the Ministry of public works will be done by calling the sleep in the principles of technical specifications.
• Electrical installation according to the project will be used by TSE certified materials.
• Office building closed input deemed appropriate and in the public areas of phone, high-speed internet, television will be all about the grid line facility studies.
• Television, satellite dish as the center when the building will be. Each will be drawn into the cable entry of the Office installation.
• The required illuminations, security entry points, water tanks, water pump, the lobby, block, blocks, floor Hall of elevators that can provide uninterrupted energy generator for the system will be established.
• Parking lot and around the building will be allocated sufficient security camera system in December.
MECHANICAL FACILITIES of the building, all mechanical project works within the Ministry of public works will be mainly technical specifications. Architectural project with complete integrity provides optimized mechanical projects (heat insulation, plumbing, fire, heating, cooling, ventilation, air conditioning, etc.) will be implemented on the spot according to the technology of the day.
• Offices air conditioning (cooling and heating) VRV system will be made. The system's technical infrastructure will be brought into the Office and main equipment will be installed by the contractor.
• Mechanical systems will be used in accordance with the project material in the references given below.
Plumbing • water pump Wilo or equivalent • Vitrified Vitra Serel-ECA or equivalent Fire • fire pump Wilo – Grundfos – KSB or equivalent • fire Cabinet Topgab entertainment – fire hose – Kim or equivalent • Sprinklers Victualic – Globe or equivalent cooling units • VRV System Trane – Mitsubishi – Carrier or equivalent Bathroom • wet grounds ceramic BUILDING CONTROL SYSTEMS as offices and building control system;
• HVAC (heating, ventilation, air conditioning) control, • fire detection – extinguishing system, • burglar alarms, perimeter security, card access, closed-circuit television/remote access camera systems (CCTV) includes functions such as security systems will be used.
General volumes automatically;
• Air conditioning plants, • ambient lighting, • the main heating system, • generator • perimeter security, • water tank level Center will be controlled.
SECURITY SYSTEMS will be addressed as a top priority, building security system, card access, internal and external device to the metal detectors, alarm systems, fire detection-alarm-sprinkler system will be used.
• Fire detection and alarm system • fire extinguishing system • closed circuit TV system • Internal and external alarm system • system transition layup, ELEVATOR Building projects. 2 earthquake sensor, ventilated and security alarm 2.5 m/sec speed elevator will be found.
• Synchronize and optimize the flow of traffic control systems, that a sufficient number and the correct type of silent disease course, transport units, • cabin will be designed with modern and latest system elevators music broadcast, security and safety warning systems will be found.
THIN JOBS • independent unit doors steel door will be.
• Floor Hall in the ceilings of plasterboard suspended ceiling, wet volume of moisture-resistant drywall suspended ceiling system will be applied.
• Independent sections made of surface preparation, the walls, the floor in the corridors of gypsum plaster water-based paint, wet areas will be paved in the ceramic.
• Common spaces and floor Hall in the floors will be of marble, granite or granite tile.
For more information you can call the phone number 306 60 70 216.