It was designed for "pleasant moments" from the lounge to the kitchen, from the hallway bathroom.
Every corner of your new home, equipped with the leading brand in the industry. They have applied to functional architectural design your new home through every square meter is turning into a real "living area". Once you set foot on your new home before you a refreshing feeling "after" high quality "will meet.
We got the luxury of "Road" we think without the stress of the city's easy access to traffic, smiling at the door of your home açabilmektir to ...
Built at the beginning of the TEM motorway, as well as start to live in 3 easy access Ispartakule's you will understand much better how is a pleasure. No more of your time on the road, not to swim, run, sports, parents want to lie down on the grass.
Fitness Center with the architecture of equipment Have an ultra-modern Fitness Center, the new home is waiting for you. How dense your day, no matter how urgent your jobs, you will surely take to the gym every morning for 40 minutes.
Indoor parking for each apartment built in enough capacity, thanks to our closed parking lot and your vehicles safe, as well as your children's Garden in a good mood. Moreover, after the transition to the buildings of the parking lot with the other members to access the desired floor.
Indoor and Outdoor Swimming Pool located in Ispartakule outdoor and indoor swimming pools, summer and winter, take a healthy life all day, leave the water pushed the fatigue of a. ..
Security system, closed-circuit cameras 24/7 recording system, controlled vehicle and pedestrian entry-exit, expert security personnel, fire and smoke alarm systems, each apartment video intercom system. To convert to a permanent peace in this comfort we thought everything again.
SITE-WIDE TO-DO PRODUCTS 1. Site plan in the manner specified in the site have been translated into languages with firewalls, vehicle and pedestrian inputs for security points will be created. Vehicles automatic barrier-controlled inputs and outputs to the site, it will be only from a security standpoint. (ETC)
2. the situation in the plan for the use of residents of the Site specified in the common indoor and outdoor parking areas will be created.
3. as stated in the plan's things at the sports area, walking trail children's play areas will be made.
4. Layout plan is shown as green areas in the fields of herbal landscaping applications will be done.
5. Intra-Site landscape areas shall be made with efficient lighting lighting elements.
6. in accordance with the Project digital addressable fire detection and alarm system will be installed.
7. indoor and outdoor pool (swimming and paddling pool) will be made.
8. on the basis of the block were formed by heating and hot water system is the central system, twenty-four hours will provide uninterrupted supply of hot water. Independent section of warming and hot water use on the basis of the quantities they measure share will be determined by using the housing.
9. IEEE C95.1 (international electrical and electronics standard) in accordance with the provisions of grounding and lightning protection installation will be the facility
BLOCKS-WIDE TO-DO PRODUCTS 1. Rough Construction; commercial centres are conventional formwork system, houses will be made with the tunnel formwork system.
2. equipped with soil improvement, and the underlying system; "İstanbul Technical University, Faculty of civil engineering Geotechnical Division", organized by the report and accounts will be made in accordance with.
3. the façade of the blocks project in accordance with the thermal insulation (mantoloma), plaster and silokon facade paints will be made.
4. heat and water insulated terrace roof roofs of Blocks, and surface coating will be appropriate-sized gravel and/or ceramic.
5. to block floor coating; ceramic and/or marble and/or granite with footprint will be made.
6. block water based plastic paint on gypsum plaster walls will be made using the.
7. block entry ceilings; whether the paint on gypsum plaster decorative lightings will be used.
8. block entrance doors are aluminium and wrought iron, steel, chrome or wood or mixture will be made.
9. Block service and fire escapes will be one piece of marble steps.
10. service and fire escapes, railings, aluminum and/or stainless steel and/or iron railing will be made. Service and fire stairs and wall coverings, floor Hall of water based plastic paint on gypsum plaster, the ceiling will be plastic paint on gypsum plaster.
11. for each circle to block entry of wood and/or plexiglass, glass, etc. will be made from material mailbox.
12. on the basis of blocks of prismatic modular stainless steel and/or reinforced concrete water tanks, redundant sequence pump, frequency converter, package type pressure system group will be assembled.
13. the site's partner will be a single counter for the use of water and electricity, the cost of water and electricity use independent sections for housing on the basis of the counter will be attached and will be charged by the relevant institutions.
14. steps and floor space in motion-sensitive lighting fittings will be used.
15. Dirty water systems mineral filled, self heat and sound insulation, multi-layered, DIN 4102 (combustion class min. B2) and DIN 4109 (bodrum Chamber experiment measured the back installation sound level value UG; 4lt/s. max. 20dB) ' a suitable silent pipes and fittings will be used.
16. in accordance with the approved project intra-site fire system infrastructure will be drawn out, blocks, social facilities, etc. shall be made links of facilities. Project and fire regulation as digital addressable fire detection and alarm system will be installed. Fire regulations in high-rise buildings, all very independent sections addressable fire detection and alarm detectors will be facility. Also installation of sprinkler in high block in accordance with the project will be made.
17. All blocks traffic on account of the appropriate number of and speed, TSE and CE standard elevator supply and installation will be made. High block also fire regulation, emergency rescue equipment will be the elevators.
18. in all public areas and apartments will provide 100% will be redundant when that energy generator capable system.
19. lift door of natural granite and/or marble and/or wood and/or stainless steel lift frame will be made.
APARTMENT-WIDE TO-DO PRODUCTS 1. Apartment entrance doors steel door and door jamb and casing, two faces of wood and/or will be covered with PVC.
2. all the Windows in the independent section of PVC joinery and/or aluminum joinery and double glazing will be synergy. There will be a double drop-down Windows 1.
3. Independent of the sections in the wood paneling in the hallway and/or pvc coating coat/cloakroom cupboard will be made.
4. Independent sections of interior doors of wood and/or MDF doors, PVC coated or mono block-filled glass and/or glass inner door wing, deposit box, jamb will be made and will be replaced with metal parts. Door handles from stainless steel and will be produced as a badge.
5. in accordance with a sufficient number of children protected grounded power socket sortisi socket outlet sortie when in, telephone, data will be recorded for security purposes.
6. Independent of the sections will be equipped with lounge and bedrooms with stro. Dwellings living rooms, bedrooms and kitchens curtain tape will be created.
7. Two common walls separating the apartment living room and/or rooms will be made from parts of thermal and acoustic insulation.
8. Central heating installation is to be done, will be done with heat expenses sharing calorimeters. Apartments in all the rooms in accordance with the project panel radiator made of compact mounting of valve regulations minimum 15 ° c, the temperature of the scene will be set up in accordance with the TS EN 215 capable of thermostatic van
No comments:
Post a Comment