Pages

Thursday, February 26, 2015

GÜZEL EVLER

GÜZEL EVLER


Project delivery date: the project is scheduled to be delivered at the end of December 2013.

Beautiful houses, in two blocks and top-quality designed, different types of 100 to the Department a life full of exclusive offers for peace.

Garden and landscape with you miss the chance to relive their neighborly relationship, where you will find a home with beautiful houses, equipped with a closed-circuit camera system, 24-hour security system and indoor parking also offers a combination of comfort and trust.

Children's play park your kids find the opportunity these days with difficulty, and play outdoors safely, new friendships will enjoy beautiful houses are being constructed as earthquake and fire regulations.

NEW MARKET, New Market, in line with the rapidly changing and developing work plans in the hood as a great investment opportunity awaits you. Indoor and outdoor parking areas Sefaköy poised to become new commercial and shopping center in New Market, rapidly flowing to residents living in Houses also needs to provide easy and timely offers.

TEMPO ENGINEERING SERVICES CONTRACTING industry and trade Inc. TERMS of the CONSTRUCTION and BEAUTIFUL HOUSES SITE TECHNICAL CONDITION LIST this document "Tempo beautiful houses Site" project, described the scene list. General design and application principles of the scene List, the system will be used and describe the general lines of the materials. Click all kinds of architectural material used; kitchen and bathroom cabinets, joinery and moldings and all other materials for manufacturing with brand, design, color and pattern do not constitute the basis of the principles. Tempo engineering services contracting and trade Inc. is combining technical and administrative mahal has the right to make any changes in the list.

GENERAL STRUCTURE of: all items to be used will be the TSE norms.

Recent earthquake regulation system reinforced concrete structure bearing and the column is based on the raft while the basic system.

Quality concrete C 30/37, 300 kg/cm² concrete strength, concrete steel class is selected as the S 420 (bçiii).

It was built separately for each block ground studies.

The project will take place at the ground: all the studies are based on feedback from the development and Planning of Küçükçekmece Municipality was carried out.

HEAT, sound and water insulation: basement floor and curtains will be from water insulation in accordance with the project.

Basement ceilings and screens, heat isolation will be made in accordance with the project.

The roofs of all blocks heat and water insulation shall be made in accordance with their projects.

Generator, water pump and water tank of the water insulation required at the venues.

Exterior coating system which provides heat insulation shall be made in accordance with the project.

PLUMBING: plumbing, hot and cold water main lines and branch lines will be made using the PPRC plumbing pipe and fittings.

Potable water, will be provided in the main distribution network of the city. Mains water pressure tank system will be available to store and.

Sewage installation for TSE certified PVC pipes and fittings to be used and will be connected to the main sewer network.

The system uses hot water 24 hours a day to meet the needs will be in the facility.

Each independent part is placed into hot and cold water counters, industrial water consumption in each independent unit through the means and will be billed on a monthly basis separately.

Water-saving 2-stage with built in closet will be used.

Volume of 150 m3 water tank as a reserve on the site will be located.

FIRE FACILITIES: Turkey Fire Protection Regulations all public areas in accordance with the standard of the fire alarm and extinguishing system facilities will be recorded for security purposes.

Floor Hall in the fire extinguisher cabinets, fire alarm buttons and beacon will be the siren system.

Block entrances, intra-site social facilities with central heating in the fields of natural gas supplies; the earthquake and the gas leakage detection will be furnished as automatic shut-off valve and solenoid cutting in. 

Indoor parking in fire alarm system in a project is shown in smoke detector, cabinets, fire-prevention and fire-fighting system (sprinkler) will be made.

All fire exit stairs, Elevator halls, public spaces and volumes in General is showing "exit/exit" escape aspects of the fixtures will illuminate permanently.

"Emergency Lighting Fixtures without any power failure, the control will be designed to burn.

HEATING: heating of each flat with natural gas fuelled hot water boilers will be provided from central system. Each independent unit will be placed in the entrance is digital heat counters cost share and general cost share from common areas, energy consumption means and will be billed at.

The bathrooms have heated towel Rails-type will be used in other scenes the radiator panel radiators.

AIR CONDITIONING: 1 + 1 and 2 + 1 apartments have a lounge with 1 (one) air conditioning engine will be prepared.

3 + 1 apartment has a living room, and master bedroom split air system infrastructure will be prepared.

Electrical system: wiring TSE and EN standards and materials will be used.

All buildings in the grounding system will be made.

To protect human life on dashboards leakage current protection relay will be.

In order to meet the energy needs of the site will be made independent transformer.

In the Hall there will be multiple socket applications in the TV location.

2 + 1 and 3 + 1 apartment in the living room and all bedrooms, 1 + 1 TV socket in the Lounge will be in apartments.

In the early part of the beds in bedroom parents who will be doing the electrical system buttons vavi.

All the plugs in residential properties will be protected the child type.

The kitchens include at least two pieces in the top of the counter, bathroom and ensuite bathrooms will have at least one power outlet.

Within the block, each floor Hall in the charged type "emergency lighting equipment" will be found.

Environmental lighting energy-saving fittings will be used.

There will be two corridors outlet.

According to the project for the site lightning rod system with lightning protection system will be made.

Phone/TV/İNTERNET INSTALLATION: each apartment Turk Telekom specifications and in accordance with the project 2 (two) pieces will be infrastructure for external phone line.

Circle the appropriate telephone and TV sockets to the project will be placed.

All apartments have CAT-6 to a point where internet infrastructure network wiring will be delivered.

TV installations will be done according to the satellite system. Own a House with more than one satellite receiver plug want to embed a TV separately. The system of new channels and encrypted channel by taking the new packages will be suitable to grow.

Turk Telekom by realization of cable system to be used in intra-site global erects will be made.

GENERATOR SYSTEM path during power outages, illuminations, block entrances, security cameras, building water and fire Depot hydrants, Elevator, intercom, all types of fire alarm equipment and plant, staircase and floor space, central heating and hot water system and to meet the energy needs of the closed parking lot, when the generator will be recorded for security purposes.

Security: the Site externally relay-in harmony with the landscape, with wire fence walls and/or iron guardrails and the firewall with at least one control point will be organized.

As site security system throughout the site's entrance and garden wall will be installed the camera system at certain points.

In the case of earthquakes by standing on the floor near the elevators can stand will open its doors so that a

No comments:

Post a Comment