The POLICY POSITION of the PARK HOMES, Eyüp District Kare neighborhood is being built on a plot of 3,700 m2. The project, including land, is the biggest of recent years in urban area is adjacent to the Vialand investment in entertainment and activities and Vialand on a hill overlooking the landscape is entirely. Kare Mahallesi; City Centre (Besiktas – Scott), TEM Highway and bridges, very close to the historic city location (job – Fatih) and rapidly renewed building stock with alternative life is rapidly becoming central distance times. Real estate values in the area are constantly increasing. project completed ' K – Beşiktaş – hanger lane – Mahmutbey ' metro line is currently under tender. the route of the line is planned to undergo operational in 2015, policies on PARK project area, very close to metro stops are seen in the front.
PROJECT DETAILS "PRINCIPLE in the design of the PARK HOMES project circle functionality and aesthetic needs are discussed together. When creating floor plans, families tried to create the most convenient and comfortable spaces.
A modern approach has been adopted in the design of the façade; composite, woodwork and stone elements have been used to a refined aesthetic level also. Highlighted by color and texture selection is made by considering the target as a perception of elegant and spacious.
The lot layout and structures need to be renewed, taking into account the texture of urban architectural approach where respectful and harmonious project is aimed. The entire project, the plot spans 4 underground parking floor and consists of 3 blocks on 11 floors above ground. Overground floors, 1 + 1, 4 + 1, in varying sizes and qualities of 182 apartments.
The project features an outdoor pool, fitness, steam room, sauna, and relaxation is a contained in sections of the Sports Centre is stipulated. A block under floor daily to meet every need of malik, a modern supermarket-run is scheduled. "
Policy Park Homes Eyüp project 76,91 square meters with 1 + 1 apartment, 2 + 1 between 63,91 apartments 67,86 square meters with 108,84 square meters 3 bedroom apartments, between 101,82 between 147,34 square meters, with 4 + 1 apartments are 182,87 with 201,90 sqm has been designed.
Policy in the outdoor swimming pool, the Park houses of Eyüp fitness room, sauna, steam room, super market, covered parking, relaxation areas, fitness center, children's play areas, such as social reinforcement is in the fields.
POLICY PARK HOMES TECHNICAL SPECIFICATIONS 1. BUILD SYSTEM 1.1 rough construction, conventional formwork system (colon-curtain system) and plaque will be in the form of tiles.
1.2 Construction before starting drilling ground survey will be made and the necessary applications will take place for the breeding grounds.
1.3 statement of raft Foundation System.
1.4 Building in the foundations and basement curtains is to be specified in the project details will be insulated against water.
1.5 Earthquake on a rough construction System design and implementation and related standards will be asleep.
2. FACADE 2.1 Facade cladding elements specified in the architectural project in and/or special paints will be used.
2.2 the Battlefront will be determined in accordance with the details in the application architecture project heat insulation.
2.3 the façade of the independent sections, in appropriate places and sizes featuring first class insulation PVC joinery will be used.
2.4 Glass heat-insulated double glazing will be.
3. BLOCK the ENTRANCE and BLOCK the COMMON AREAS of the block entry, floor halls and 3.1 of stoneware ceramic and/or floor coverings and/or marble will be.
3.2 walls and ceilings on satin plaster or water based plastic paint will be applied.
3.3 Block at the main entrance and the stairs are aluminum and/or iron railing will be made.
3.4 each apartment block to the entrance to the mailbox will be formed.
4. the APARTMENT door to the apartment entrance and Corridor 4.1 4.1.1 INSIDE wood or wood-like PVC coated steel composition door will be.
4.1.2 entrance and hallway floors will be ceramic coating.
4.1.3 Ceiling gypsum plaster water-based paint will be applied.
4.1.4 the walls, water based paint on gypsum plaster or wallpaper will be applied.
4.2 Salon 4.2.1 Floor laminate flooring roofscape.
4.2.2 Materials will be applied to the appropriate water-based dye on gypsum plaster.
4.2.3 water based paint on gypsum plaster on the walls or wallpaper will be applied.
4.2.4 Hall will wooden gate.
4.3 Kitchen floor covering will be ceramic Kitchen 4.3.1
4.3.2 shall be applied to water-based paint on gypsum plaster on the ceiling.
4.3.3 the walls are gypsum plaster water-based paint or wallpaper be, countertop ceramic or another material water resistant decorative will be used.
4.3.4 kitchen countertops, laminate coating will be.
4.3.5 Kitchen cabinets, laminate, lacquer or veneer will be.
4.3.6 Armature Artema, e.c.a. or domestic/foreign counterpart will be.
4.3.7 Stainless Sinks will be used.
4.3.8 Arçelik, Vestel or generic brand dishwasher, cookers, hoods and ovens will be installed ready for use.
4.4 4.4.1 the bathroom floors and walls in Vitra, Seranit, Egeseramik or equivalent ceramic residue.
4.4.2 the ceiling, suspended ceiling or drywall over water-based paint will be applied.
4.4.3 Armature Artema, e.c.a. or domestic/foreign counterpart will be.
4.4.4 Sink Vitra, Castle, Duravit or similar will be domestic/international brand.
4.4.5 Bathroom countertops will be water resistant laminate coating or acrylic.
4.4.6 bathroom cabinets, laminate or lacquer coating will be wood.
4.4.7 Acrylic shower tray or ceramic shower scene and shower cabin will be.
4.4.8 toilet seat Vitra, Duravit, Geberit or similar will be domestic/international brand.
5. MECHANICAL INSTALLATION 5.1 Plumbing 5.1.1 Related standards, PVC and/or polypropylene clean and quiet sewage pipes will be used. Hot water pipe insulation will be featured.
5.1.2 All apartments will use hot water from the central system. Each apartment is using hot water apartment office counters/heat inputs with cost share will be determined. Apartment Office of ' sub-station ' inputs device with the owner of the apartment will be provided with the possibility to check your personal consumption.
5.1.3 cold water will do, regardless of each circle subscription.
5.1.4 water usage will be provided from the city network. All apartments have 1 daily water capacity to meet clean water tank and boosters will be facility.
5.2 heating installation 5.2.1 will be provided with natural gas fuelled heating boiler system central Apartments.
5.2.2 Apartment they share meter/counter input with the heat in each apartment has to be determined by the amount of hot water used by a heating unit and building management will be about by the apartment owner notes.
5.2.3 Apartments will be used in decorative radiators, heated towel Rails, will be used in wet places.
5.2.4 the kitchens will be drawn into a gas line in January. Related natural gas subscriptions will be made on behalf of the owner of each apartment.
5.2.4 Balcony apartments, air conditioning for the Assembly Hall-balcony in the required infrastructure will be prepared.
5.3 fire facilities 5.3.1 Building and throughout the site will be all about regulations measures.
5.3.2 flats hallway smoke detector, kitchen to gas and heat the detector will be mounted.
5.3.3 floor Hall in the fire alarm buttons and architectural project will be shown in places when the fire cabinets.
5.3.4 indoor parking in fire detection and suppression system will be made.
6. ELECTRICAL INSTALLATION will be equipped with lightning protection and earthing installation 6.1.
6.2 cables and equipment suppliers in the selection standards will be asleep.
6.3 where shown in architectural projects intended, leakage will be protected when dashboards.
6.4 apartment Interior for use in electrical outlets will be with child protection. Bathroom and balcony in the sockets will be covered.
6.5 Eur.