Crown Deluxe, right in the Centre of life in Bahçeşehir... Access to the Motorway İstanbul you with pop-up and full Esenkent Centre will provide the Crown Deluxe, again in 2011, which was opened in İstanbul's new shopping centre in the Centre of Bahcesehir beside apply for AVM's new rising.Crown Deluxe, residents can easily all the needs of corporations, fun and really is one of life's doors to privileged.
Quality perception is different to emphasis on discerning and details, if you have one, if it's not your style to make do with standard Crown Deluxe interpreting quality and luxury in a different way.
Now, another housing project continue to wander around our website to experience or come to our Office, introduction of coffee and expert consultants accompaniment customers you get a quality journey. Crown Deluxe's location, and how does it add value to your life with will present you will see for yourself.
Whatever your preference, whatever it is, the closer you quality at your fingertips. Please tap.
DISTINCTIVE FEATURES of the PROJECT are the TECHNICAL SPECIFICATIONS of earthquake-resistant, ground reinforcement and rough Construction Specifications Basic soundings made at a depth of 30 feet and under, according to this investigation has been created. Safe for the identification of classical methods and cross-sectional bored pile Strain Guage method used and according to the base under the Q100 cm diameter, 30 feet tall, bored pile made of an implementation. The project Ground consulting at Boğaziçi University, Prof. Dr. Erol Güler and conducted by the team.
Block b under the terrace sections, including 252 pieces, Q100 cm bored piles made of an implementation.
Block foundations and carrier system: block in the foundations, 2.00 meters high raft made of basic implementation. Structure betonarmesi specially made and all conventional formwork system formwork-scaffolding system designed specifically for this project.
Concrete and steel high-strength base C35 and top class: the structure of C40 class ready mixed concrete will be used. Will be used in reinforced concrete de St III steel.
Insulation: raft Foundation under EU Shcoumburg crystallized waterproofing material with capillary Betocrete insulation is made of, basic, and curtain side has been made with the EU on the EU in the Combiflex Schoumburg isolation.
Exterior wall: coating for heat and sound insulation of Blocks and modern composite panels residue.
All the apartments and common security in wireless busbar system with possible fire warning and extinguishing system will be made.
Intelligent intercom system fire alarm, burglar alarm and call the elevator of the House will be featured, cross-apartment calls, social spaces and reception units of communication security and surveillance, interviewing site monitoring opportunity.
Fire-fighting facilities, Sprinklerli will be held with the extinguishing system.
Mechanical water tank: Modular use + fire water storage tank will be reserved.
Heating: central system will be used, with kalorimetreli Shares.
Energy performance in buildings directive "will be held in accordance with the frame-Heater temperature measuring device (calorimetry) and measurement,-Cold water meter and measurement-hot water meter and measurement, monitoring and control service, as determined by the company for a period of 10 years by Doing B during will be provided in all spaces panel radiator, chrome heated towel Rails in the bathrooms will be used.
Cooling: in living rooms air conditioning electric wiring (except for copper pipe) will be made.
Electrical wiring in Buildings and public places with sensor lighting, modern lighting with spotlights on the building entrance, apartment Interior balcony, bathroom and ensuite bathroom lighting will be made. The site will influence and power shortages in the public scene 3-4 automatic can enter and punishes with a generator that can be disabled.
Phone infrastructure for apartments of 1 or 2 PCs socket will be used.
TV installation, satellite broadcasts and cable broadcasts will be eligible for.
Internet: fiber optic cables for high-speed data access in the apartments with ADSL internet connection installation will be made.
Elevators: A fully automatic high quality floors fast service, will be the subject of independent security intercom and elevators.
Building entrance: reception and the lobby also places 1st class imported natural granite or imported marble, walls is imported paper, decorative stone or similar will be used in modern applications.
Modern lighting will be decorated with. Will be waiting lobby.
Floor Halls: 1st class glazed granite, ceramic or marble stairs are 1st class will be marble.
Circle on thin work steel door: 1. class indicidual multi-point latching inox stainless steel edge, MDF, complete wood-like will be made.
Room doors: 1. class indicidual on MDF lacquered coated doors will be made.
PVC joinery: 4 + 16 + 4 double glazed double window S series and joinery profile is 7000 series, all French and normal Windows tilt will be made.
Bathrooms: wet floors 1st class ceramic, modern flat boat onto the glass cabin, Vitra, Canakkale Ceramic or equivalent will be used.
Bathroom cupboard: MDF with pvc membrane coating on the hull will be made.
Vitrified Group: 1. class indicidual fixtures, closets and sinks. Brands Vitra, Canakkale Ceramic or equivalent would be.
Kitchen: Particleboard top covers the body of pvc coated high gloss solid color cover lower lids, wood-textured melamine-covered structure, drawers and flaps that cover the brake system will be.
Built-in kitchen Equipment: Franke, Arçelik or equivalent brand will be January, hood and oven.
Kitchen countertops: 1. class indicidual acrylic countertop.
Floor coverings: 2 + 1, 3 + 1 and 4 + 1 apartment living room floors 1. class laminated parquet, bedroom floors 1st class laminated parquet with TSE shall be carried out. 1 + 1 apartments have a lounge and bedroom floors, laminate flooring will be done.
Switches, Sockets: Legrand, Viko or equivalent will be Inside the apartment walls: gypsum plaster onto satin PuTTY, water-based paint will be made. On request; free sample apartment is one of the colors in the textile-based imported wallpaper (*) can be done. (*) In terms of the functioning of the program wallpaper request product supply sales will be stated at the time the contract was concluded.
Ceilings: there will be a white plastic paint on gypsum plaster. Used in paints; Weber, Filli paint, Marshall or equivalent would be.
CONTRACTOR, ARCHITECTURE, PROJECT AND TECHNICAL SPECIFICATIONS MAHAL LİSTESINDE RESERVES THE RIGHT TO MAKE CHANGES TO THE MATERIAL USE OR EQUIVALENT.
STRAIN GAUGE TECHNIQUE of Strain Gauge technique in pile loading test: high-rise buildings where the ground to comparatively under raft Foundation reinforcement if it receives a specific height to the floor base system, carrier sockets are formed with the piling. This resistance to the tip of the pile, usually due to the critical displacement conditions allow freight from the superstructure because it is not exclusively chemical friction is expected to carry with. Therefore, the design will be used as the chemical resistance of friction units, analyzing, measuring volume in applications doing important chemical resistance of bored pile by determining the vertical project throughout the pile load borne a particular security-related ıspatlanması of great importance. For this purpose, except block, aimed to analyze the design of bored pile on the load test is carried out. At least two times the design load of stakes is being installed. In this experiment, the Unit conducted friction resistance of the walls of the experiment on the reinforcement along the stakes placed in a special way through the unit measures the deformation Strain Gauge is measured by track deformation. As a result, the chemical resistance of depth distribution and the applied load is how much of the pile wall and tip ar