BAHÇEKENT FLORA

BAHÇEKENT FLORA


Gardencity Flora, and a combination of all the possibilities of the city where you will find your stay both the nature of the offer of life!

119 thousand square meters of land area, on Gardencity Flora's total construction area calculating as 195 thousand square meters. 875 units in the project have been given commercial area of the circle is leaving the 33 thousand square-foot section.

$ 300 million investment with the cost of life is found in the submissions of the 2016 Gardencity Flora in September are planned. The project area is between the ages of 65 sq.m 287 square meters, 1 + 1, 2 + 1, 3 + 1 and 4 + 1 type of apartment options are taking place.

INTRA-SITE GLOBAL PRODUCTS 1. Site plan in the manner specified in the site have been translated into languages with firewalls, vehicle and pedestrian inputs for security points will be created. Cars site inputs and outputs will be provided with an automatic barrier controlled OGS engine. There will be a Plug-and-play security building site entries.

2. Intra-Site vehicle and pedestrian roads will be open and/or covered parking.

3. Disability and children's building with elevators that transport circulation will be provided, social facilities and baby carriages will be formed in such a way.

4. within the Site perimeter wall on and/or iron railing/fence holds security purposes under the control of a closed-circuit camera (CCTV) will be established, the Security Center 7/24-hour monitoring and recording will be conducted.

5. in accordance with the project/digital IP-based color video doorphone intercom system will be established. The apartments, block the entrance and the entrance gate will be able to communicate with voice and video site.

6. Project and fire regulation as digital addressable fire detection and alarm system will be installed.

7. Fire regulations multi storey high buildings all independent sections (Inner Circle entrance, corridor, bedrooms, and living room for the smoke detector, kitchen for heat and gas detector) addressable fire detection and alarm detectors will be facility.

8. in all public areas and apartments will provide 100% will be redundant when that energy generator capable system.

9. IEEE C95.1 (international electrical and electronics standard) in accordance with the provisions of grounding and lightning protection installation will be the facility

10. in accordance with the concept of architectural design and project; the public will support the needs of electrical and scene of the Administration sees fit designed grid-connected (on-grid) renewable energy systems will be in accordance with regulations and specifications also.

11. the scope of the project open and/or indoor swimming pool will be constructed. Pool filtration system, sun terraces, changing cabins, showers and feet disinfection pools will be made.

12. ornamental pools and/or artificial ponds, biological filtrasyonlu, decorative fiskiyeli, will be held as a special led backlight.

13. the scope of the project urban furniture, relaxation areas and a children's play groups will be found. According to the project site are herbal and structural landscapes will be approved. 14. the scope of the project will be the basketball and/or volleyball court.

15. parks, gardens, walkway lighting and road lighting project of lampposts and decorative type of led luminaire will be with also.

16. Project and in accordance with the specification of blocks will be automatic when the waste recycling system.

BLOCK-WIDE TO-DO PRODUCTS 1. The façade of the blocks, architectural project in accordance with the siding materials and/or exterior paints will be used and will be wrapping.

2. exterior walls thermal brick and/or block of brick and/or concrete, internal walls are brick with materials made of aerated concrete wall and/or will be made.

3. Roof; terrace roof is water and heat insulation made of natural stone and ceramic sonar and/or/or Pebble Creek applications will be done.

4. Block the entrance for each apartment mailbox will be made.

5. on the basis of blocks of prismatic modular water tanks in stainless steel and/or reinforced concrete, non-redundant sequence pump, frequency converter, package type pressure system group will be assembled.

6. use of your household hot water, stainless steel heat exchangers, the desired hot water worth of water output adjustable type of apartments will be provided with entrance station (Sub-station).

7. in accordance with the approved project site drinking water system infrastructure will be drawn out, blocks, social facilities, commercial units, when the site entry plug, etc. will be made of the links.

8. the blocks and sewage installations mineral filled DIN 4102 and DIN 4109 available silent pipes and fittings will be used.

9. Architectural floor plan YangınYönetmeliğine as appropriate places shown in the fire Cabinet, installation of fire sprinkler water intake mouth and will be made.

10. Central cascade system (mini-boiler and/or wall mounted condensing boiler) heating installation is to be done, will be done with heat expenses sharing calorimeters. Final Accounts; bathroom in the scene except in accordance with the project compact valved PKP and/or PKKP type panel radiators, bathroom radiators Towel warmers in chromium will be used.

11. Fixed camera, digital keypadli, LCD screen, capable of opening the door intercom with a password and when Bell Panel will be recorded for security purposes.

12. sortisi decorative lighting fixture in accordance with project/facility will be recorded for security purposes. Project is the name of the block in accordance with the armature will be sortisi when the lighting.

13. in accordance with the service and their fire escape Project type B will be decorative fittings also. Thanks to the introduction of these fittings will be independent also of motion detectors will be with.

14. number of blocks between traffic account and fire regulations, and speed, TSE and CE standards, emergency rescue equipment supply and installation of lift, which will be made.

APARTMENT-WIDE TO-DO PRODUCTS 1. Apartment entrance door door jamb and casing, two faces of MDF wood and/or PVC and/or laminate and/or lacquer paint will be covered and will be assembled together with Accessories.

2. apartment interior doors; Mono block full door and/or laminate veneer on MDF and/or and/or lacquer paint and/or PVC coated glass and/or glass inner door wing, deposit box, jamb will be made and will be replaced with metal parts.

3. Independent of all external frames of PVC joinery and/or aluminum joinery + heat control coated double glazing will be made. Obviously, there will be at least 1 is a double drop-down.

4. Independent section in the hallway of the wood veneer or lacquered, painted or pvc coated hanger/cloakroom cupboard will be made.

5. Two common walls separating the apartment living room and/or rooms will be made from parts of thermal and acoustic insulation.

6. Approved in accordance with the project site will be drawn at the natural gas infrastructure installations, blocks, social facilities, commercial units and other natural gas consumption will be held at the facilities of the connections.

7. heating facilities; In accordance to its projects, as the compact made regulations in assembling valve panel radiators as mahal minimum 15 ° C the temperature can be set in accordance with the TS EN 215 thermostatic valve and/or the thermostat will be mounted.

8. in accordance with the project into the living room, split air-conditioning infrastructure installations (copper pipe and drainage) will be made with the installation of the internal and external unit.

9. master bedroom split air conditioning in accordance with the project infrastructure installations (copper pipe and drainage) will be debited.

10. electrical and lighting installations; Furnishing an adequate number of suitable alternative architectural and project/TV outlet will be sortisi also. In accordance to its projects, when the chandelier on the ceiling as sorties will apply.

11. a sufficient number of children protected, grounded power outlet the gore Project sortisi will be the facility

12. a sufficient number of accordance with the phone and will be enough when the data outlet sortie.

13. TV system; System 60 RF (20 P/BG channel + 40 QAM (30 SD QAM + 10 HD QAM) digital bouquet, 30 Digital (QPSK) package + FM QPSK-PAL/BG channel, 30 Digital (QPSK) packet broadcast on in a single Center, picking up 47 with 2400 MHz. range of mixed fiber-coaxial (HFC) or alternatively only the coax Ultra Broadband (UBB) will give to the distribution networks. Appropriate receiver can now be followed also encrypted using publications.

The MANUFACTURING HALL/construction WALL plaster + plastic paint will be made.

PAVEMENT Pr