Project 2 blocks-174 Apartment Security-soil studies ypış was built in accordance with the 2007 International building blocks-yonetmeliği class A basic floor, raft reinforced concrete base, the c35 class can be constructed with a concrete, s 420 construction steel, webbed reinforced concrete constructions-nights, days, closed circuit camera system-Controlled site entrances and exits-Experienced security team-block entrances intercom system and indoor parking space for each apartment Comfort-digital encryption-one of the emergency rooms and the lounge with 3 elevators-laminate flooring-special design foksiyonel kitchen and bath cabinets-Payölçer system, central heating-Built-in home appliances-Air-conditioning-İnternet infrastructure, external telephone line for each apartment-central satellite system-İntercom system-generator for public areas, against power failure system-fire alarm Life-outdoor pool and Sun terrace-hiking trails-children's playground-Squash, sauna, steam bath, dressing rooms, vitamin bar-Residence concierge services-to meet every need recreative areas are Location-Sabiha Gokcen airport and İstanbul Park 14 miles-E5 Highway-made on the Anatolian side of the world in the face of the largest Court-Anadoluray light rail system stop is within walking distance-the Marmaray project in the European Coast can be reached in 35 minutes tamamlandıgı okan University, Sabancı University, Pendik fair Convention and Congress Centre proximity-Bat ferry port 8 km-Eagle ferry port 3 km-Kadikoy ferry port 14 km construction system Ground rock as units located in raft Foundation doka formwork with, reinforced concrete, frame, non-bearing Interior and exterior walls/partitions, block bricks, aerated concrete and precast elements are formed.Wood or steel reinforced concrete coating for waterproofing membranes, roof, heat and tile or mineral-coated, polyester carrier bitumen membrane roofing materials or similar will be used.The reinforced concrete constructions in the TSI in accordance with c30 skilled concrete, reinforcing reinforcedconcrete skeleton or later will be used.
The apartments offer central heating system the heating system will be used to "share" with the possibility of individual use will be provided.
Cooling system the cooling system in your household air conditioning installation engine and air-conditioning will be provided as standard.
Electrical installation Electrical telephone installation is imbedded.In accordance to its projects, deployment is to do TSE certified cables and fittings will be used.Each apartment will have two phone jack for the topic.Each independent electricity meter will be installed and the section auto insurance will be.Each apartment and blook entry door intercommunication systems and joint satellite antenna installation will be connected.Plugs grounding safety circuit for the fugitive to take precautions structure grounding also piping safety supplies will be found.Installation will be equipped with the Auto Insurance Board within the apartment.
Electric power supply site specific transformer and generator will be found.
Plumbing system with TSE quality certificate PVC pipe plumbing, building columns made of galvanized pipes will be the main distribution when.Central System water needs will be covered hidraforla the tiers.
Intercommunication between the main door and the Security Block apartment will system.The site will be protected with electronic closed-circuit video system.Escape routes, fire escapes, emergency lighting and such places will have to redirect.
Fire systems will be reinforced concrete standards, fire stairs.Common places alarm button and fire alarm sirens will be found.
Exterior cladding facade insulated precast/aluminium composite panel/drawing room furniture material will be made in accordance with the details in the architectural project.
Entrance and stairs block entry to be made in anodized aluminum or metal door.Building entrances, stairs and entrances will be coated with marble, building entrances for each apartment mailbox and a babyphone Bell system will be mounted.Stair railings will be metal.
Elevator including elevator emergencies in each block will be 3 elevators, lifts the generator is to be fed with emergency floor stop property will be.
Flooring in the hallway, Hall, kitchen and bathrooms are 1st quality ceramic, rooms and slon 1. quality laminate flooring residue.
Wall coverings, bathroom walls 1st quality tiles, other walls is PK satin paint roofscape.Bathroom ceilings will be the suspended ceiling.
Windows color and tissue Architecture projects heat insulation bridge aluminum joinery-tilt-featured-have characteristics of heat and sound insulation with double glass.
The doors are located in the apartment floor plan interior doors whereas wooden entrance doors to the apartment if the panel coated security steel door will be.
Kitchen hardware plumbing counter mount sink, 1. quality kitchen fixture will be installed and extractor fan, dishwasher required for connection to the equipment will have been completed.The structure will be used as 1st quality laminate kitchen cabinets will be produced.On top of the kitchen counter and floor-to-ceiling cupboards under the countertop installation will be made.Machine will not stay in contact with the floor of the base cabinets.Worktops laminate, they will sink TSE certified.
Bathroom hardware bathroom sanitaryware, taps and bathroom cabinet with Special equipment will be used.
Loads of other accessory fields across the project to each circle the parking garage 1 vehicle location will be found.An outdoor swimming pool, Sun terrace, children's play areas, a jogging track, racquetball, dressing rooms and vitamin bar will be made.
Mahallerde-related material to be used, will be left out of the producer firm production reasons in the case of disruption-related material will be used instead of the counterpart.
It Works from a technical point of view if necessary, reserves the right to make changes in the list of the scene.
For more information, 0216 452 12 contact us at 12.
HABERLER03 PROJECT-08-2012-Bailey construction Helenium Twins in 220 thousand TL, immediate delivery last 13 daire19-04-2012-Helenium Twins Kartal deliveries starting! 200 thousand TL..
No comments:
Post a Comment