By PROGRESSING VERY QUICKLY in VISTA, the foundations in June the CONSTRUCTIONS being thrown By completion of construction for all the rough winter in Vista without being planned. It takes a aralaksız way By Vista studies no later than within 1 year of delivery for all facilities used.
GENERAL 1-Sauna 2-swimming pool 3-Social Field 4-Fitness Room 5-Door Intercommunication System Building Entries Sensor 6-7-introduction to Building entrances and Digits Granit 8-children's play area 9-Satellite and telephone Installation 10-each apartment Mailbox 11-2 elevators in each Building (speed control) 12-central heating System 13-T.s.e. Certified Petekler 14-Electric, Plumbing T.s.e. certified 15-decorative steel door 16-blocks have Earthquake according to the status of raft Foundation building inspection was made In 17-18-2 Years to be up and running Condominium Founding technical service 19-camera system SİTE FEATURES 1-24 hour security 2-generator for the common Fields 3-5-4-swimming pool with relaxation area-walking and Jogging Areas 6-Game parking area For Park BUILDING 7-Guest PROPERTIES 1-Exterior Ytong Brick Higher thermal insulation Jacketing silicone based Paint
2-Soundproofed apartments are Between 3-cross-Asmolin double brick Ceiling Styrofoam Soundproofed) 4-double lift (speed controlled automatic door) 5-6 fire-fighting Equipment on each floor-water tank and Pressure 7-Lightning 8-apartments earth leakage Relay 9-meeting room 10-Store 11-12-13-the drainage system Around the buildings Shelter fire stairs CONSTRUCTION TECHNIQUES 1-raft Foundation 2-C-30 Concrete 3-Earthquake Regulation 4-Ground R BATH 1: Walls, 1. Class 2-custom wallpaper in the bathroom: floor covering, 1. Class ceramic is 30 * 30 Sized 3: Hilton washbasin, Toilet Reservoir (with cover) 4: the master Bath, washbasin and Wc 5: bathroom accessories: SOAP dish, Meiyan, Toothbrush "chrome plated" 6: Bathroom Cabinet Countertops, mirrored table with sink Marble 7: Acrylic shower trays shower tray 8: single Body battery and Shower Mixer Spiral 9: Towel Radiator 10: Ceiling, suspended ceiling Above plastic paint KITCHEN 1: kitchen cabinet MDF LAMThe body membrane cover 2: kitchen counter Top Glazed 1. Class Granit Granit Coating Over 4: 3: Countertops Made Way to assemble the hood 5: kitchen faucet, TSE Branded 6: Dishwasher Valve, TSE-branded 7: walls Satin Plaster water-based Satin Paint 8: plastic paint on gypsum plaster Cornice Around the ceilings are 9: Floor 1. Class ceramic is 30 * 30 Sized ENTRANCE HALLWAY 1: Condos Vestier 2: Floor 1. Class ceramic is 30 * 30 Sized 3: the walls are Satin matte paint Satin water based on gypsum plaster 4: Ceiling gypsum plaster Plastic interior paint DOORS apartment interior doors: wooden-cased And Cornices Veneered Door door handles: TSE-branded door lock Hall 1: Wallcovering satin plaster Over water-based Satin Paint 2: plastic paint on gypsum plaster Ceiling Cornice Around 3: Floor 1. Class laminate flooring 4: Room French balcony PVC heat Glass 5: living room balcony, French balcony chrome plated Rails BED ROOMS 1: floor coverings 1. Class laminated parquet 2: walls water based matte satin satin gypsum plaster Paint 3: plastic paint on gypsum plaster Ceilings Around Papier 4: Glass double glazed PVC LOCATION-3 minutes from the airport-3-minute walk from shopping malls-Formula 1 and 5 minutes from the Marina, close to the runway-Pendik-İDO Denizotobüsüne 5 minutes away-3 minutes from the Beltway to get more detailed information: 0216 595 08 contact us at 27.
No comments:
Post a Comment